Description
Important Note
Eden aim to complete installation within 10 working days from delivery of your greenhouse. This may be longer in peak timesYou will be required to agree to and sign Edens terms and conditions.Installation price includes the erection of the following pre-bought items only: Greenhouse, downpipes, autovents, louvres, roof vents and cresting.
Please note: Discounts do not apply to this product
Basic terms and conditions
A flat and true concrete or slabbed base must be pre-laid in readinessArea prepared should be free from any obstruction (an example being manhole covers)Area should be free from overhanging obstacles (examples being tree branches, power lines)The area should allow the building to be installed providing access to all sides (18'-24')Please ensure that you have pre-checked your garden building 72hrs before your installation reporting any problems to Edens Customer Service on 01242 676625
Only available to mainland UK postcodes
Reviews
There are no reviews yet.